2026-11-21 · 6 min read · Del Rey
What should I check on a Del Rey home before escrow closes?

The short answer
Escrow on a Del Rey home moves fast, and the window to catch a problem is small. Read every report in writing, confirm your insurance quote, look at the physical house twice, and make sure the names and numbers on your closing papers match the names and numbers in your contract. Below is the same list in the order each item actually shows up, from the preliminary title report to the final walk-through.
The preliminary title report
The preliminary title report arrives in the first week of escrow. It lists who is on title today, every recorded lien and deed of trust, every easement, and the CC&Rs if the property has them. Read it against your contract. The seller name on Schedule A has to match the person signing the grant deed. Schedule B lists everything that will stay with the title unless it is paid off or released: unreleased mortgages, judgment liens, mechanic's liens, and leased or financed solar panels that may need a UCC filing cleared.
If anything on Schedule B surprises you, bring it to your escrow officer before your title contingency deadline. A solar lease that has not been paid off, a property tax lien that was never released, or a shared driveway easement all change what you are actually buying. The guide to shared driveway easements on Del Rey homes explains how that one plays out when the home shares a driveway with the house next door.
The Natural Hazard Disclosure
California sellers hand over a Natural Hazard Disclosure, usually called the NHD, as part of their disclosure packet. It tells you whether the address sits inside any of six state-designated zones: a special flood hazard area, a very high fire hazard severity zone, a wildland fire area, an earthquake fault zone, a seismic hazard zone, and a dam inundation area. For most Del Rey addresses, the entry that matters is the flood zone line. Streets near Ballona Creek sit inside a FEMA Special Flood Hazard Area, which changes your insurance picture.
Under the standard California Residential Purchase Agreement, buyers have three calendar days to review the NHD after hand delivery, or five days after mailing, and can cancel during that window and get their deposit back. That is a short clock. The NHD and the matching report should be the first disclosure you read, not the last.
The 9A report
Del Rey sits inside the City of Los Angeles, so every sale here requires the City's Residential Property Report, usually called the 9A. The seller orders it and the escrow officer puts a copy in the file. It is a records check at the Department of Building and Safety, not a physical inspection. The report lists the permitted use and zoning, any open permits or stop-work orders, active code enforcement, and a short set of city retrofit items: smoke and carbon monoxide detectors, water conservation fixtures, impact-hazard glazing on shower doors, a seismic gas shut-off valve, and bars on bedroom windows where present. It also flags pending special assessments the City may be planning on that block, like a sewer or sidewalk project.
Two lines on the 9A matter most for a buyer. Open or expired permits are the first, because a conventional or FHA lender can require them to be finaled before funding, and a smart buyer will push for a credit, a repair, or a hold-back if the seller cannot close them in time. The second is the permitted use, since a converted garage, an added bedroom, or a back-house that was built without permits will show up as a gap between the public record and what you are seeing in person. The deeper read on what the report reveals is in the piece on the 9A report when selling a Del Rey home.
Your insurance quote, in writing
Homeowners policies for Del Rey are not interchangeable, and the quote you got during loan pre-approval was an estimate. Ask for a bindable quote on the actual address during your inspection window. If the home sits in the Ballona Creek flood zone, a federally backed mortgage will require flood insurance, which is a separate policy from your homeowners coverage. Standard homeowners policies do not cover flooding anywhere in California. Flood coverage comes through the National Flood Insurance Program or a private flood carrier, and the premium depends on the specific property, not just the zone.
Ask the carrier to put the premium in writing before you release your inspection or appraisal contingency. A number that moves from three figures to four changes your monthly payment, and that change belongs in your budget before closing, not after.
The inspection reports
Your general home inspection is the longest document in the file. Read every page, including the photographs. Older Del Rey homes, especially the bungalows and ranches built in the 1940s and 1950s, often carry findings that are typical for the housing stock here: aging electrical panels, galvanized plumbing, original single-pane windows, and roofs near the end of their service life. None of those are deal-killers on their own. They are budget items, and the time to talk about them is during your inspection contingency, not after you own the house.
Two specialty inspections are worth paying for on most Del Rey homes. A sewer scope, where a camera is run from the house to the city main, catches cracked clay pipe, root intrusion, or a collapsed section before it becomes your plumbing bill. Scope findings are negotiable, and the walkthrough of how that conversation runs is in the sewer scope article for Del Rey. The second is a chimney inspection if the home has a fireplace, since a cracked flue is not visible from the firebox.
If the house was built before 1978, the seller is required to give you the federal lead-based paint disclosure and a copy of the Environmental Protection Agency pamphlet. You can test for lead if you want, and the lead-based paint disclosure explainer for Del Rey covers how that check works and what a positive result means.
Your contingencies and your loan
A standard California Residential Purchase Agreement has three buyer contingencies: the inspection contingency, the appraisal contingency, and the loan contingency. Each has a default review window and a form your agent uses to remove it. Removal is not automatic. Until you sign the removal, your deposit is protected if you walk away for a reason inside that contingency.
Watch the loan contingency carefully. Final loan approval can slip if the lender comes back with a late condition, like a request for a payoff statement on an old credit account or an updated appraisal review. Keep every document the lender asks for moving the same day. A clear-to-close is the signal that funding is on track, and your agent and escrow officer should confirm it before the loan contingency is removed.
The final walk-through
The final walk-through, called the Final Verification of Condition in the California form, happens one to three days before closing. Under the standard contract, it is not itself a contingency, but it is your last look before you own the house. Walk slowly. Run every faucet, flush every toilet, open every window, and test the garage door opener. Confirm every item the contract said was included is still there, from the range to the light fixtures. Look at the condition of the walls and floors the seller moved furniture off of. If a repair was credited or promised, confirm it was done.
If something is wrong at the walk-through, you have real options. Closing can be delayed while the seller fixes it. A hold-back in escrow can set aside enough of the seller's proceeds to cover a specific repair after close. In serious cases, a problem at the walk-through is a reason to pause before signing the loan documents. Say something before you sign, not after.
Your loan documents and your wire
Your lender will send loan documents to the escrow officer, who sets up your signing appointment, usually at the escrow office or with a mobile notary. Read the note, the deed of trust, and the closing disclosure. The interest rate, the loan amount, the monthly payment, and the cash to close have to match what the lender locked. The property address on the deed has to match the address you are buying, letter for letter.
Wire fraud is the one risk at this stage that does not come from the property. Call your escrow officer at the phone number on the escrow instructions, not a number in an email, and confirm the wire details verbally before you send any money. A fraudulent email that looks like it came from escrow is the most common way buyers lose their down payment, and it is almost always preventable with one phone call.
Work with an agent who runs the checklist with you
Every Del Rey home has a few items that are specific to the address, and the ones above are the common thread. I walk buyers through each report, the contingency clock, and the final walk-through, and I keep a copy of every document on file so you have it after closing. For the full picture of what to expect after keys change hands, the guide to what to know after buying a home in Del Rey is a good next read.
Book a consultation at firstkeypacific.com/contact or email me at bobejo@firstkeypacific.com. No pressure, just real answers.
Common questions
- When should I read the Natural Hazard Disclosure on a Del Rey home?
- Read it the day it arrives. Under the standard California Residential Purchase Agreement, buyers have three calendar days to review the NHD after hand delivery, or five days after mailing, and can cancel during that window and get the deposit back. Streets near Ballona Creek sit inside a FEMA Special Flood Hazard Area, which changes your insurance picture, so the flood line on the NHD is usually the one that matters most for a Del Rey address.
- What does the Los Angeles 9A report cover on a Del Rey sale?
- The 9A, officially the City of Los Angeles Residential Property Report, is a records check at the Department of Building and Safety. It lists the permitted use, open or expired permits, stop-work orders, active code enforcement, a short list of city retrofit items like smoke and carbon monoxide detectors and water conservation fixtures, and pending special assessments the City may be planning. It is not a physical inspection. The seller orders it, and your lender may require any open permits to be finaled before funding.
- Do I need flood insurance on a Del Rey home near Ballona Creek?
- If the address sits in a FEMA Special Flood Hazard Area and you are using a federally backed mortgage, flood insurance is required. Standard homeowners policies do not cover flooding anywhere in California. Flood coverage is a separate policy, either through the National Flood Insurance Program or a private flood carrier. Ask for a bindable quote on the actual address during your inspection window so the premium is in writing before you remove any contingency.
- Is the final walk-through a contingency in California?
- No. Under the California Residential Purchase Agreement, the Final Verification of Condition is not a contingency, but it is your last opportunity to inspect the property before escrow closes. The walk-through typically happens one to three days before closing. If something is wrong, you can ask to delay closing, request a hold-back in escrow to cover a repair, or in a serious case, pause before you sign the loan documents.
- What should I check on the preliminary title report?
- Match the seller name on Schedule A to the person signing the grant deed. Read Schedule B line by line for unreleased deeds of trust, judgment liens, mechanic's liens, easements, and CC&Rs. If the home has leased or financed solar panels, confirm whether the lien has been paid off or will be at closing. Any unexpected item on Schedule B needs a payoff or demand statement before your title contingency deadline.
- What inspections should I order on an older Del Rey home?
- A general home inspection is the baseline. On most older Del Rey homes, a sewer scope is also worth it, because a camera in the line catches cracked clay pipe, root intrusion, or a collapsed section before it becomes your plumbing bill. If the home has a fireplace, add a chimney inspection. If the home was built before 1978, you also receive the federal lead-based paint disclosure, and you can test for lead during your inspection window if you want.